The Epic Centre established a precedent for the use of sustainable building techniques and materials on the Lincolnshire Showground site.
The project minimises the use of materials that have a high embodied energy and maximises the use of recycled materials.
An air source heat pump is incorporated to provide hot water and space heating requirements.